PrepSolution

PHR · Aligned to the HRCI 2024 ECO

PHR Complete Pass System

The Adaptive Platform1 / 5

Platform
Video Course
Book
Flashcards
Mock Exams

$25.00/mo · $149.99 billed once · 6 months of access

  • 1,700+ exam-style questions on the HRCI 2024 ECO
  • 3 timed mock exams, 115 questions each
  • Adaptive Practice that targets your weakest areas
  • PHR Explained Video Course: 26 animated lessons
  • HRCI Essentials Book: 461 pages, 16 chapters
  • 600+ Rapid Recall flashcards across 7 functional areas
  • Reviewed by SHRM-SCP-certified HR professionals
  • Pass Guarantee on every Complete Pass System plan

Access length

One-time payment · 6 months · No subscription

  • Instant access
  • Phone, tablet & desktop
  • Secure checkout
VISAAMEXPayGPayDISC
PrepSolution Inc. BBB Business Review
The Pass Guarantee
  • Complete the study plan and all three mock exams, then sit your exam
  • If you don't pass, your plan extends free for the same length you bought
  • Send your score report within 30 days of your exam date
  • Included with every Complete Pass System plan
Full terms
Access and delivery
  • Login details arrive by email within 5 minutes of purchase.
  • Fixed access length, no auto-renewal.
  • Every update published during your access is included.
  • Works on phone, tablet and desktop.
Employer reimbursement
  • Many employers cover exam prep as professional development.
  • Every purchase comes with a receipt; custom invoices on request.
Copy the approval email
  • 1,700+

    Exam-style questions

    Aligned to the HRCI 2024 ECO

  • 3

    Mock exams

  • 26

    Video lessons

    PHR Explained Video Course

  • 8

    Modules

    3.2 hours of video

  • 600+

    Flashcards

    7 functional areas

  • 460+

    Book pages

    HRCI Essentials Book

“Passed PHR on my first attempt. The 1,700 questions with rationales taught me the WHY behind every law, not just the answer. The Employee & Labor Relations practice alone was worth the price.”
Marcus T. · PHR
The PHR Platform

Practice that studies you back

Every session feeds the engine — it learns what you miss and rebuilds your next session around it.

Answer questions and the bank quietly rebalances — your weakest functional areas get more reps, automatically, after every single session.

The practice picker with Adaptive Practice recommended, above strengths and needs-work panels with per-functional-area accuracy bars

Daily quizzes, assigned practice sets, and a streak that keeps you honest between workdays.

Assignments with due dates beside the streak card: a five-day flame streak and a week row of study days

Three full 115-question timed mocks with a question palette, flagging, and inline comparison tables — the same rhythm as test day.

A timed PHR mock exam with countdown clock, question palette, and flag-for-review controls

One readiness score, a week-by-week trend, and per-functional-area accuracy — so "am I ready?" stops being a feeling.

The analytics dashboard: accuracy versus cohort trend, an accuracy-by-functional-area radar, and strongest and weakest subjects

Highlight inside any explanation and save it as a note. Every note stays linked to the question it came from.

The built-in notebook: a saved note on federal coverage thresholds, highlighted text, and a link back to its question
In their words

What candidates tell us

Federal law was my nightmare going in. The drawn-out decision trees made FMLA and FLSA finally click — I could see the rule work instead of rereading it for the tenth time.
Keisha B.PHR · HR Coordinator
Honestly, half of what I learned came from the wrong answers. Every option gets explained, so even a bad guess turned into something I remembered on exam day.
Tom G.PHR · First attempt

Passed with PrepSolution? Share your story.

Share your story
Video course

PHR Explained Video Course

Twenty-six animated lessons across eight modules — every high-yield PHR pattern turned into a scene you watch and hear. Each rule is a decision-tree or timeline, not a definition to memorize.

26animated lessons8modules3.2hours of video

Drawn in the same visual hand as HRCI Essentials — the law spine you watch is the same one you annotate in the book.

The book

HRCI Essentials Book

One visual guide across aPHR, PHR, and SPHR — plain-language theory, every framework drawn instead of described, and each credential’s scope clearly marked on the page.

HRCI Essentials Book — table of contents

4 parts · 16 chapters

Chapters 01–03Strategy & Leadership
  1. 01The HR Professional & the Three Credentials — What HR is, and which of the three exams you are sitting for
  2. 02Business Management & HR Strategy — Reading the business, then building HR strategy that serves it
  3. 03Leading the HR Function — Leadership, motivation, change, and influence without authority
Chapters 04–10The Employee Lifecycle
  1. 04Workforce Planning — The right people, in the right roles, at the right time and cost
  2. 05Talent Acquisition — Sourcing through the offer and onboarding
  3. 06Learning & Development — From performance gap to capability
  4. 07Performance & Talent Management — The systems that measure, develop, and keep your people
  5. 08Total Rewards I: Compensation — Job evaluation, market pricing, and the law that bounds pay
  6. 09Total Rewards II: Benefits — Mandated benefits and the ones the employer designs
  7. 10Employee Engagement & Relations — Engagement, voice, fair discipline, and investigations
Chapters 11–14Law, Labor & Risk
  1. 11Labor Relations — From the statutes to the bargaining table
  2. 12Employment Law I: Equal Opportunity — The EEO statutes, theories, and landmark cases
  3. 13Employment Law II: Wage, Hour & Leave — FLSA, FMLA, WARN, and classification
  4. 14Risk Management, Safety & Security — OSHA, safety, and data privacy
Chapters 15–16Data, Ethics & Readiness
  1. 15HR Information Management & Analytics — The HRIS and the analytics that turn data into decisions
  2. 16Ethics, Professionalism & Exam Readiness — The HRCI Code of Ethics and the exam strategy that earns the pass
See the book series
460+pages280+diagram plates3credentials, one guide

Included with every Complete Pass System plan — read it on any device, no extra cost.

PHR®, SPHR®, and aPHR® are registered trademarks of the HR Certification Institute (HRCI). This independent study resource is not endorsed by or affiliated with HRCI.

Chapter 01

The HR Professional & the Three Credentials

Foundations

Free chapter · The book

Read Chapter 1, free

Chapter 01 · The HR Professional & the Three Credentials · Foundations

Flashcards

600+ flashcards, zero filler

The thresholds, agencies, and one-line differentiators that have to be automatic on exam day — tagged by functional area.

  • Labor Relations

    NLRB ULP Charge Filing Window

    6 months from the alleged unfair labor practice. Compare: 180 days EEOC default, 300 in deferral states.

  • Labor Relations

    ADR Methods

    Open door, peer review, mediation, arbitration — informal internal talks escalating to binding third-party decisions.

  • Engagement

    Stay Interview

    A proactive talk asking top performers why they stay — retention feedback gathered before anyone decides to resign.

  • Engagement

    Flight Risk Matrix

    Plots probability of departure against impact of loss. Aim stay interviews at the high-risk, high-impact quadrant.

  • Engagement

    360-Degree Feedback

    Anonymous input from manager, peers, subordinates, and customers. Best used for development — not pay or promotion.

  • Talent Acquisition

    Economic Realities Test

    The DOL’s employee-versus-contractor test under the FLSA: economically dependent on the employer, or in business for themselves?

  • Talent Acquisition

    IRCA

    No hiring unauthorized workers. I-9 Section 1 by day one; the employer completes Section 2 within 3 business days.

  • Talent Acquisition

    ADA Conditional Job Offers

    No medical exams or disability questions until after a conditional offer, for employers with 15 or more employees.

  • Total Rewards

    HIPAA Special Enrollment Period

    30 days to enroll after marriage, birth, adoption, or loss of coverage — 60 days for Medicaid or CHIP events.

  • Total Rewards

    FLSA Workweek

    A fixed, recurring 168 hours — seven 24-hour periods. Define it strictly on compressed schedules to avoid surprise overtime.

  • Total Rewards

    PBGC

    Federal agency insuring private defined-benefit pensions — pays participant benefits up to a legal cap if an employer goes bankrupt.

  • Business Management

    Sarbanes-Oxley Act (SOX)

    Public companies need internal financial controls and an officer ethics code — and financial-fraud whistleblowers are protected from retaliation.

  • Business Management

    Compliance vs. Ethics

    Compliance meets legal requirements; ethics follows core values even where no law applies. Allowable versus right.

  • L&D

    70-20-10 Model

    70 percent experiential learning on the job, 20 percent social coaching, 10 percent formal instruction.

  • HR Information

    EEO-1 Private Employer Threshold

    100+ employees for private employers; federal contractors report at 50. Annual demographic report to the EEOC.

Sixteen cards from the live deck, lightly compressed to fit the card face. Every card in the product carries the full detail.

Detailed rationales

Wrong answers turn into cheat sheets

Miss a question and the explanation comes back as a color-coded table — the law, the threshold, and the trap side by side. Far easier to remember than a paragraph.

coded teaching diagrams
950+
comparison tables
800+
mocks with inline tables
3
  • Side-by-side comparisons
    Coded comparison table from a PHR explanation: PUMP Act lactation space requirements — what the FLSA requires versus what it does not, with the non-bathroom rule called out
  • Process flows, in order
    Coded process flow from a PHR explanation: the four-step benefits program implementation sequence, from program design to plan document to system configuration to rollout
  • Thresholds, at a glance
    Coded reference table from a PHR explanation: key HR numerical thresholds — 15 employees for Title VII and ADA coverage, 30 hours for ACA full-time status, 40 hours before FLSA overtime, 50 employees for ALE status

Counted from the live bank: 54 percent of QBank questions carry a coded teaching diagram, with 838 comparison tables across the package — including the inline tables inside the three mock exams.

Short on time

Exam in a few days? We've got you.

$39.99one time

One month of access · no subscription

Inside the Starter

  • The Adaptive QBank, 1,700+ questions
  • Rapid Recall flashcards, 200+ cards
  • The Pass Path study calendar
  • The Exam Mirror, 1 timed mock exam

Only in the Complete Pass System

  • PHR Explained Video Course — 26 animated lessons
  • HRCI Essentials Book — 460+ pages, 280+ diagram plates
  • The Pass Guarantee, which extends your plan free if you don’t pass
Or see the PHR Complete Pass System

The Pass Guarantee

Complete the plan and the mocks. If you don't pass, you keep studying free.

If you complete the study plan, take all three mock exams, and don’t pass, we extend your plan free for the same length you bought — a 3-month plan gets 3 more months, a 6-month plan gets 6, a 12-month plan gets 12.

  1. 1

    Finish your study plan and all three mock exams.

  2. 2

    Sit the exam. If you don’t pass, send your score report within 30 days.

  3. 3

    Your plan extends free for the same length you bought.

Included with every Complete Pass System plan.

Compared with the other PHR options

Prices and features re-verified on July 17, 2026.

PHR prep options compared feature by feature
FeaturePrepSolutionHRCI Cert PrepHRCPPocket Prep
Full access price$249.99 / 12 mo$449 to $699$480 one-time$20.99/mo or $124.99/yr
One-time payment, no subscriptionYesYesYesNo
Pass guarantee includedYesmoney-backmoney-back3 free months
Total practice questions1,700+count not disclosed2,1501,500
Full-length 115 question mock exams3 mocksincluded3 mocks3 mocks
Digital study book includedincluded, 460+ pagestextbook costs extraYesNo
Video course includedYesYesaudio onlyNo
Adaptive engine (targets weak areas)YesPartialNoPartial

Pricing and feature data pulled from each provider’s public website and re-verified on July 17, 2026. HRCI prices reflect the Cert Prep bundles ($449 promo base to $699 regular with premium video), all 180-day access. HRCP price reflects the 2026 Complete Print and Online edition. Pocket Prep price reflects the annual subscription. PrepSolution is our product; we are not affiliated with HRCI, HRCP, or Pocket Prep.

Who it is for

Built for every rung of the ladder

One volume, three credentials. Wherever you stand on the HRCI ladder, the book meets you there.

  • The aPHR starter

    No HR experience required, and the exam expects none. The Foundational tier walks you through the field from the first page, and chapter 1 tells you exactly what the aPHR asks.

  • The PHR candidate

    The working professional’s rung. The Do it tier keeps you at Professional depth across the whole lifecycle, from workforce planning to the bargaining table.

  • The SPHR leader

    Strategy and judgment at the top rung. The Lead it tier marks the Strategic layer the SPHR tests: reading the business, leading change, and owning risk.

  • The career switcher

    Coming to HR from another field? One volume teaches the whole body of knowledge in order, and the credential ladder in chapter 1 shows you where to step on.

  • The visual learner

    286 diagram plates in one consistent hand and 200 fact panels. Maslow, the nine-box, the four-fifths screen, drawn once and kept.

  • The team certifying together

    One book covers every rung, so an HR department can study from one consistent source whether each member sits the aPHR, the PHR, or the SPHR.

What the PHR is worth

HRCI publishes no salary research of its own, so these are the US government’s figures for the roles the PHR serves — operational HR today, management as the career compounds.

$75,940median annual pay, US human resources specialistsBLS OES, May 2025
$149,280median annual pay, US human resources managersBLS OES, May 2025
+5%projected growth for HR manager roles, 2024–2034 — faster than the average occupationBLS Occupational Outlook

Published figures from the cited sources — individual pay varies by market, role, and experience.

Blueprint coverage

7 content areas, weighted the way the HRCI 2024 ECO exam weights them.

  1. Employee & Labor Relations20%
  2. Employee Engagement17%
  3. Total Rewards15%
  4. Business Management14%
  5. Workforce Planning & Talent Acquisition14%
  6. Learning & Development10%
  7. HR Information Management10%

Frequently asked questions

Everything you need to know about PHR prep.

About PHR prep

The HRCI-affiliated Learning System runs about $895 and centers on instructional reading. PrepSolution’s Complete Pass System is built around 1,700+ adaptive questions, 3 mock exams, 600+ flashcards, the HRCI Law Map, study calendars, and a pass guarantee for $249.99. We focus on practice volume, applied federal-law judgment, and the rationale-first explanations PHR candidates need to actually pass.

All content is aligned to the HRCI 2024 PHR Exam Content Outline — 7 functional areas: Business Management (14%), Workforce Planning & Talent Acquisition (14%), Learning & Development (10%), Total Rewards (15%), Employee Engagement (17%), Employee & Labor Relations (20%), and HR Information Management (10%). If your study materials still reference the pre-2024 outline with 5 functional areas, they are outdated.

HRCI requires a minimum of 1 year of professional HR experience with a master’s degree, 2 years with a bachelor’s, or 4 years with a high school diploma. Eligibility is verified by HRCI when you apply — our prep platform supports candidates across all three pathways.

HRCI candidates typically need 80–120 hours over 10–14 weeks. Our 12-week calendar structures this into 60–90 minute daily sessions weighted toward Employee & Labor Relations (20%) and Employee Engagement (17%). The 8-week accelerated path is roughly 12–15 hours per week.

PHR (HRCI) leans heavier on U.S. federal employment law and the operational HR generalist role — strong fit for compliance-focused roles. SHRM-CP leans on behavioral competencies and Situational Judgment Items. Many HR pros take both over time. If your employer or job posting names one specifically, default to that. If neither is named and you handle day-to-day federal compliance, the PHR is usually the cleaner first credential.

PrepSolution for the PHR

The PHR Complete Pass System is built as a complete prep path: 1,700+ practice questions aligned to the HRCI 2024 ECO, each with a written rationale, plus 3 full-length mock exams. Every question is written and reviewed by credentialed professionals who hold the PHR, and Complete Pass System plans carry the pass guarantee: finish the study plan and mocks, and if you don’t pass, your access is extended free.

PHR prep starts at $89.99 one-time and runs up to $249.99 for the longest Complete Pass System plan. Every plan is a single payment for a fixed access length — no subscription and no auto-renewal — and current prices are always shown on this page’s pricing section.

Candidates usually weigh PrepSolution against HRCI Learning System, Pocket Prep, Mometrix. PrepSolution’s approach: every question is written by credentialed PHR holders, every answer includes a full rationale, plans are one-time payments rather than subscriptions, and the Complete Pass System includes the pass guarantee. When comparing, check question counts, which formats are included at each price, and access length.

About PrepSolution

You’ll receive an email with your login credentials within 5 minutes of purchase. If you don’t see it, check your spam folder or contact support@prepsolution.com.

No. Every plan is a one-time payment. You pay once and get access for the full length of the plan you choose — 3, 6, or 12 months. There are no recurring charges, no auto-renewals, and no hidden fees.

If you complete the study plan, take all three mock exams, and don’t pass, we extend your plan free for the same length you bought — a 3-month plan gets 3 more months, a 6-month plan gets 6, a 12-month plan gets 12. This guarantee is included exclusively with the Complete Pass System.

Yes. If you purchase and decide it’s not the right fit within 24 hours, contact support@prepsolution.com and we’ll process a full refund. No questions asked.

No. PrepSolution is an independent exam preparation company. We are not affiliated with, endorsed by, or sponsored by SHRM, PMI, AACN, or any certification body. Our content is developed based on publicly available exam blueprints and content outlines.

Many candidates come to PrepSolution after a failed first attempt. The most common reason for failure is approaching judgment-based questions with workplace instinct rather than a systematic framework. Start with a diagnostic mock exam to identify your weakest domains, then follow the targeted study plan.

Many employers cover professional development costs including exam prep materials. After purchase, you’ll receive a receipt that can be submitted for reimbursement. Contact support@prepsolution.com if you need a customized invoice.

PHR Complete Pass System

6 months · $149.99Pass Guarantee includedChange plan

PHR study materials