PrepSolution
PMPHigh-YieldBusiness Environment 26%
Business Environment jumped from 8% to 26%, this is why

Organizational Change Management

3

Models

Kotter, ADKAR, Lewin

8

Kotter Steps

Urgency to anchoring in culture

26%

Biz Env Weight

Jumped from 8% to 26% on the July 2026 ECO

change is a staircase · skip a step and you fall

Kotter's 8-Step Ladder

cultural adoptionstep 1Create Urgencyburning platformstep 2Build Coalitiongather alliesstep 3Form Visionpaint destinationstep 4Communicaterepeat 10× morestep 5Empowerremove obstaclesstep 6Short-Term Winsvisible proofstep 7Consolidatedo not declare victorystep 8Anchor Itbake into culturedonestatus quo → change over time

how to read this

  • › Eight steps, bottom-left to top-right. Each step builds on the previous.
  • › The first three are mindset (urgency, coalition, vision). The middle three are action (communicate, empower, wins). The last two are durability (consolidate, anchor).
  • › Most change programs fail because someone skips urgency and jumps straight to communication. Nobody listens without the burning platform.
  • › "Short-term wins" (step 6) is critical — people need proof in the first 6–18 months or the effort dies.

ADKAR & Lewin · Individual vs Stage

ADKAR · individual journey

A

Awareness

know change is coming

D

Desire

want to participate

K

Knowledge

know how to change

A

Ability

can actually do it

R

Reinforcement

sustain it

Lewin · three phases

Unfreeze

🧊→💧

break the status quo

Change

💧→

move to new state

Refreeze

→🧊

solidify the new normal

Exam Traps

Organizational change is different from project change control

Project change control handles scope and schedule requests. Organizational change management helps people adopt new ways of working. The exam tests both.

The PM supports, does not lead

Organizational change is typically led by change management specialists or business leaders. The PM supports adoption but is rarely accountable.

Resistance is expected

People resist change for valid reasons. Dismissing resistance as irrational is wrong. Listen, understand, address the underlying concern.

Kotter starts with urgency, not planning

Step 1 of Kotter's 8 steps is creating a sense of urgency. Without it, change efforts stall. The exam tests the order.

Change people, not just process

A perfectly planned rollout fails if people do not adopt it. Adoption is half the work.

Do not skip urgency

Kotter step 1 is urgency. Without it, nothing else works.

1
Create Urgency

Your doctor tells you to exercise or face consequences. Suddenly change feels necessary. That is Kotter step 1.

2
Form a Coalition

You tell a friend and commit together. Change needs allies, not heroes.

3
Create a Vision

Picture what fit looks like. Motivation needs a target, not just fear.

4
Anchor in Culture

Once working out is just "what I do on Mondays," it stops being change. It becomes habit. That is the final Kotter step.

Urgency, coalition, vision, communicate, act, win, consolidate, anchor.
reading is not enough, you gotta practice

Ready to test your PMP knowledge?

1,800 practice questions written by certified professionals.

Start Practicing PMP
Reviewed by Chris K., PrepSolution Content Editor, Project Management
Sources verified against PMI 2026 standards
Updated May 2026