60% of the exam involves agile and Scrum is the most tested framework

Scrum Framework

3

Roles

Product Owner, Scrum Master, Developers

5

Events

Sprint, Planning, Daily, Review, Retro

3

Artifacts

Product Backlog, Sprint Backlog, Increment

the sprint cycle · one loop per sprint, forever

Sprint Cycle

the containerSPRINT1–4 weeksSprint Planningwhat + howDaily Scrumevery day · 15 minSprint Reviewproduct with stakeholdersRetrospectiveprocess with team

how to read this

  • › The Sprint is the container in the middle. Everything else happens inside one Sprint, then repeats.
  • › Start with Sprint Planning (top) — the team picks work and agrees on a Sprint Goal.
  • Daily Scrum (right) — the team syncs for 15 minutes every day to inspect and adapt.
  • Sprint Review (bottom) — show the working increment to stakeholders and collect feedback.
  • Retrospective (left) — the team inspects their own process and picks one improvement for next sprint.
  • › Then the loop restarts. Same rhythm, forever.

Three Roles · Three Artifacts

Roles

Product Owner

Maximizes value. Owns the Product Backlog.

Scrum Master

Servant leader. Removes impediments.

Developers

Self-organizing, cross-functional.

Artifacts

Product Backlog

Ordered list of everything. PO owns.

Sprint Backlog

Committed items + plan. Team owns.

Increment

Sum of done items. Meets DoD.

Exam Traps

The Scrum Master does not assign work

The Development Team self-organizes and pulls work from the sprint backlog. Any answer that has the Scrum Master dispatching tasks is wrong.

The Product Owner owns what, not how

The PO prioritizes the backlog and defines acceptance criteria. How the team builds the solution is the developers' decision. PO overriding technical choices is a trap.

The Daily Scrum belongs to the developers

The Scrum Master may attend but does not run it, report to stakeholders in it, or turn it into a status meeting for management. It is a team sync for the team.

Sprint length is fixed, not elastic

You choose a sprint length at the start and keep it. Stretching a sprint to finish unfinished stories is a trap answer. Move the work to the next sprint instead.

Review is product, retro is process

Sprint Review inspects the increment with stakeholders. Retrospective inspects the team process. Do not confuse them.

Definition of Done is binary

A story is either Done or not Done. No "80% done" in Scrum. Incomplete work returns to the backlog.

1
Product Owner Picks the Setlist

The PO decides which songs to rehearse next based on the upcoming show. They set priority and tell the band what the audience wants.

2
Scrum Master Books the Studio

The SM removes impediments. Bad mic, broken amp, argument between drummer and bassist — the SM handles it. They do not play an instrument or tell the band how to play.

3
Developers Decide How to Play

The band members are cross-functional, self-organizing, and collectively accountable. They figure out arrangement and technique together.

4
Sprint Review, Then Retro

At the end of the week the band plays the setlist for friends (Sprint Review). Then the band talks about how rehearsal went and what to change next week (Retrospective).

PO decides what. Developers decide how. SM removes what is in the way.
reading is not enough, you gotta practice

Ready to test your PMP knowledge?

1,800 practice questions written by certified professionals.

Start Practicing PMP
Reviewed by Chris K., PrepSolution Content Editor, Project Management
Sources verified against PMI 2026 standards
Updated May 2026